Case Studies

Temporary offices used for Covid-19 testing and vaccination

Bi-Coastal Covid-19 Testing and Vaccination Sites

Amidst the ongoing global pandemic, a healthcare provider found itself in need of temporary COVID-19 testing sites to help keep patients and staff safe. With offices across the U.S., they needed modern, multi-functional workspace on both coasts that could meet their changing with their needs.

Two story temporary buildings used for social distancing workspace during Covid-19 vaccine development

Covid-19 Vaccine Development Office Space

When a local Baltimore biopharmaceutical company was tasked by Johnson & Johnson to produce a potential COVID-19 vaccine, they quickly began making plans to transition their modular office swing space into additional vaccine development workspace.

Hawaii Air National Guard Tower Simulator Shelter

Hawaii Air National Guard Tower SImulator Shelter

WillScot delivered and installed a double-wide, fully equipped modular building for the Hawaii Air National Guard Tower Simulator Shelter that blended in with existing buildings at the airfield.

Covid-19 Testing Space

Jewish General Hospital

Having worked with WillScot in the past, the hospital turned to WillScot’s local Montreal team to deliver a modular solution in less than a month. In 30 days, the first of two new testing clinics was set up on top of a parking structure adjacent to the hospital.

Kamehameha Schools At Windward Mall

Kamehameha Schools at Windward Mall

Kamehameha Schools was under pressure to prepare more children for education. The district chose WillScot custom modular buildings to house a temporary preschool for 3 & 4 year olds while new facilities were being built.

Temporary classroom space for social distancing at Loyola University

Loyola University Social Distance Classroom Space

The WillScot Construction Services Division developed a plan to install 30 modular classroom buildings on Loyola's multi-purpose field adjacent to the university's student center and bookstore.

Temporary buildings used Covid-19 treatment facility in Bakersfield California

Memorial Hospital Bakersfield

Memorial Hospital, based in Bakersfield, California, was in need of additional COVID-19 testing space to help their hospital prepare for an anticipated surge in COVID-19 cases.

Mobile office trailer outside of University of Maryland

University of Maryland Upper Chesapeake

The University of Maryland Upper Chesapeake Hospital had to relocate their Covid-19 testing site, so WillScot Baltimore team was able to set up 10 Flex mobile offices in under a week outside the hospital’s new Hartford County location.

Kalaheo Elementary School

Kalaheo Elementary School

When the oldest building at Kalaheo Elementary School burned down, it was WillScot to the rescue. A modular building solution was constructed and ready in three months.

Koolani Luxury Sales Office

KO'OLANI LUXURY SALES OFFICE

The developers of Ko'olani needed a posh showroom to meet with prospective buyers of their luxury condominiums. WillScot transformed four modular units into a lavish, 3,660 square foot office.

HMSI Corporate Headquarters

HMSI Corporate Headquarters

Hawaii Modular Space, Inc., part of WillScot, had outgrown its 24' x 56' double-wide modular office building. The challenge: create a headquarters that reflected the possibilities of modular construction, and had a casual Hawaii feel.